← Back to Requests (RFQ)
Request (RFQ) Sample Request

RFQ for 3 Walk-In Cooler and Freezer Systems

Tampa, Florida, USA • Posted Jul 2, 2026
Expired REQ-000041
Request Type
One time
Buyer Location
Tampa, Florida, USA
Posted
Jul 2, 2026

Request Details & Requirements

Request Details

[COMPANY] facilities team is seeking a commercial refrigeration equipment supplier for a current requirement in Tampa, Florida, USA. The objective is to replace unreliable cooling systems before peak season.

The anticipated scope is 3 cooler and freezer systems with controls, condensing units and installation support. This is classified as a one-time, fixed-scope business requirement request.

The successful supplier should be prepared to provide shop drawings, delivery coordination, site review, and equipment selection.

Interested suppliers should address estimated energy requirements, warranty terms, permit assumptions, and equipment and labour separated in pricing.

Current budget guidance is USD $35,000–$145,000 depending on scope, with site review within 2 weeks and installation within 8–14 weeks. The final selection will consider technical fit, service readiness, pricing clarity, lead time and the supplier’s ability to communicate consistently.

Products and services must be supplied in accordance with applicable federal, state and local requirements in the United States.

Technical Requirements

Operational requirements
• Energy-efficiency ratings should be provided.
• Refrigerant and electrical requirements must be identified.
• Installation must comply with applicable mechanical and electrical codes.
• Lead times for major components must be confirmed.
• Equipment must be sized for the stated operating temperature and room dimensions.
• Controls must include temperature monitoring and alarm capability.
• Supplier must confirm capacity to complete the fixed scope within the proposed schedule.
• Primary delivery or service area: Tampa, Florida, USA.

Minimum supplier expectations
• Commercial liability insurance.
• Local warranty service capability.
• Factory-trained technicians.

Pricing and proposal details
• Service response options.
• Estimated energy requirements.
• Warranty terms.
• Equipment and labour separated in pricing.
• Project schedule.
• Permit assumptions.
• Expected timing: site review within 2 weeks and installation within 8–14 weeks.
• Budget guidance: USD $35,000–$145,000 depending on scope.