← Back to Requests (RFQ)
Request (RFQ)

EV Charging Infrastructure Design and Installation Partner Needed

Fresno, California, USA Posted Aug 6, 2026
Active REQ-000125
Request Type
One time
Buyer Location
Fresno, California, USA
Posted
Aug 6, 2026

Request Details & Requirements

Request Details

A commercial fleet operator is requesting proposals for design and installation of electric vehicle charging infrastructure at a primary depot. The first phase will support 22 light-duty fleet vehicles, with planned expansion to approximately 60 charging ports over three years.

The project should include load assessment, utility coordination, charger selection, electrical design, permitting, civil work, installation, networking, commissioning and training. Proposals should identify equipment, software fees, construction assumptions, incentives, schedule and options for future capacity expansion.

Published by the B2Base based on common business procurement needs.

Technical Requirements

The design must account for site electrical capacity, fleet duty cycles, charging windows and managed-load requirements. Chargers must carry applicable certifications and support remote monitoring, access control and energy reporting. The proposal must define communications, software ownership, warranty, service response and interoperability. Drawings, calculations, permits, test results and as-built documentation are required at project completion.

Suppliers for this Request

Relevant companies from the B2Base supplier directory.

Browse category