← Back to Requests (RFQ)
Request (RFQ) Sample Request

Commercial Box Supplier Needed for 3 Shipping Sizes

Surrey, British Columbia, Canada • Posted Jul 2, 2026
Expired REQ-000037
Request Type
One time
Buyer Location
Surrey, British Columbia, Canada
Posted
Jul 2, 2026

Request Details & Requirements

Request Details

[COMPANY] has opened a supplier request in Surrey, British Columbia, Canada and is evaluating a commercial packaging supplier with print capability capable of supporting the project.

The current requirement covers recurring manufacture of 32 ECT RSC boxes with two-colour exterior printing. The preferred commercial arrangement is one-time, fixed-scope business requirement.

The successful supplier should be prepared to provide material recommendation, scheduled delivery, digital and physical samples, palletization, and printing and converting.

Please include a practical commercial response covering tooling and plate costs, MOQ by size, and sample costs.

The anticipated commercial range is Volume pricing proposal requested. The target timing is first delivery required next quarter. A responsive supplier that can verify capacity, explain assumptions and provide a clear next step will be preferred.

Technical Requirements

Project and supply requirements
• Cartons must arrive flat-packed and palletized.
• Compression or performance test information is preferred.
• Board grade and flute must be specified.
• Print method and colour tolerance must be stated.
• Tooling ownership and repeat-order setup must be clear.
• Inside dimensions and tolerances must be confirmed.
• Supplier must confirm capacity to complete the fixed scope within the proposed schedule.
• Primary delivery or service area: Surrey, British Columbia, Canada.

Qualification requirements
• Established corrugated manufacturer or converter.
• Ability to maintain repeat specifications.
• Commercial liability insurance.
• Regional freight capability.

Response checklist
• Sample costs.
• Freight and pallet charges.
• MOQ by size.
• Unit pricing by quantity.
• Tooling and plate costs.
• Production lead time.
• Expected timing: first delivery required next quarter.
• Budget guidance: Volume pricing proposal requested.